The company attaches great importance to environmental protection and puts environmental protection management at the top of the list.

1. Wastewater: Rainwater and sewage diversion, sewage clearance diversion and quality diversion will be implemented, and roof rainwater overhead discharge will not be set up without rainwater and sewage outlets; cooling water and steam condensate will be recycled after collection for production; the total investment will be about 30 million yuan, and a sewage pretreatment (physicochemical + biochemical) system with a capacity of 6 000 t/d and a recycling treatment system with a capacity of 2 000 t/d will be built, and the production wastewater will be pre-treated. After the treatment reaches the standard, part of the water is discharged into Jiangbin Water Treatment Co., Ltd. after the treatment reaches the standard, and part of the water is reused for printing and dyeing production after deep treatment, and the water reuse rate meets the stipulated requirements.

2. Exhaust gas:

Stamping exhaust gas: All the steam needed by the stereotyping machine is supplied by coastal thermoelectric power. After collection, the steaming exhaust gas is discharged up to the standard after being treated by "water spray + indirect cooling + static electricity" device (total investment is about 8.5 million yuan).

Other exhaust gases: regulating pool and sludge pool of sewage treatment station are covered, sludge warehouse is sealed, and two sets of second-level odor treatment devices of "acid-alkali spray" are installed. The odor generated is discharged up to the standard after collection and treatment; a separate alkali spray treatment device is installed in dyestuff weighing room; a second-level acid-alkali spray treatment device is installed in desizing machine, and a separate set of waste gas collection is installed in each desizing machine. Processing device.

3. Noise: All noise-producing equipment adopts shock-proof, noise-muffling and sound-insulation measures.

4. Solid waste: Enterprises should standardize temporary storage sites for hazardous waste and general solid waste, do a good job in classified collection, comprehensive utilization and disposal of solid waste, and strictly prevent secondary pollution.

5. Set up a 1000 m3 emergency pool. The stereotyped exhaust outlets have been standardized, and online monitoring devices have been installed, and networked with local environmental protection departments. Sampling platforms, sampling ports and signs have been set up.

   
     